Implementation of the middle pillar works (Concrete works only)
PROJECT IMPORTANCE
The bridge connects the Al-Ramousa area with Aleppo’s southern road towards Aleppo International Airport
PROJECT LOCATION AND AREA
The bridge is located in the Ramousa area south of Aleppo
OWNER
The General Establishment of Roads Transport Aleppo Branch
PROJECT INCEPTION
July 1, 2018
REHABILITATING PROJECT OF SADKOP BRIDGE
STAGES AND MECHANISM OF WORK IN THE PROJECT:
A concrete cover was conducted for the cracked columns after connecting the old concrete web with the new one by dowels (8 mm), which was implanted with epoxy. The crown was then connected to the columns of the two spaces (two crowns for four columns), then the bases, upon which the braces were mounted, were molded. The braces which are being erected were collected from Damascus (place of molding)