Isolation of grains stores in Jebrin Center

PURPOSE OF THE PROJECT

Maintaining the strategic material (wheat, barley and bran) from moisture and rot by isolating storage surfaces to prevent leakage of water and moisture to the crop

PROJECT IMPORTANCE

Supporting the national economy and receiving crops from farmers

PROJECT LOCATION AND AREA

The project is located in the village of Jebrin, about 10 km east of the city of Aleppo. The total area is 85.800 m2, the area of each warehouse is 3900 m2

previous arrow
next arrow
ArrowArrow
Slider

OWNER

General Establishment for grain trade and manufacture Aleppo branch

PROJECT INCEPTION

January 1, 2018

REHABILITATION OF GRAIN WAREHOUSES IN JABRIN CENTER AND THE ADMINISTRATION BUILDING

STAGES AND MECHANISM OF WORK IN THE PROJECT

1- Dismantling the parapet blocks on the store roofs and erasing the metal covers installed over the expansion joint on the beams.

2- Cutting the metal ladders leading to the roofs, and fixing them in a good proper way.

3- Erasing the old isolation materials from the surfaces, and transporting them outside the center.

4- Smoothing the surfaces with grading machines, as well as smoothing the faces of the inverted beams.

5- Execution of cement triangle form 5 × 5 cm. or 7 × 7 cm. as per the status of the inverted bridges/beams.

6- Execution of a smooth cement layer on the beams faces at the expansion joints, and deliver the executed works to the supervisor.

7- Execution of primer layer and bitumen layers on the surface.

8- After completion layers, mechanical fixing for the slab faces will be executed by galvanized steel sheets.

DO YOU WANT TO IMPLEMENT YOUR PROJECT? CONTACT US

Scroll to Top