TAL AL-TOTON BRIDGE

PURPOSE OF THE PROJECT

Rehabilitation of the destroyed Tal al-Toton bridge

 

PROJECT IMPORTANCE

A vehicle bridge linking the villages and towns south of the main canal with the North ones.

 

PROJECT LOCATION

It is located near Jarrah Airport, on the main channel, 3 km away from the siphon

OWNER

General organization for Land Development - Upper Euphrates Basin Branch

PROJECT INCEPTION

2019-12-22

previous arrow
next arrow
ArrowArrow
Slider

The main sections of the project:

1- Establishing temporary dams

2- Dewatering between dams

3- Drilling to reach the foundations

4- Planting points and casting a base, 6 columns and a connecting crown

5- Re-casting and isolating the damaged cladding

6- Preparation of pre-made piers / 12 /

7- Casting connecting tiles between piers

8- Preparing the pre-casted footpaths, transporting and installing them.

9- Completely isolating the bridge and installing and isolating spacers

10- Casting veneer slabs and installing metal handrails with paint.

DO YOU WANT TO IMPLEMENT YOUR PROJECT? CONTACT US

Scroll to Top